The No.7 bridge optical cable won the bid, and the centralized procurement of GYTS optical cable was 1300km

Source: Popularity: 726 Time of publication: 15:43:03, February 28, 2017 Small in large

 

Sichuan electric power construction management company shall submit it to Sichuan electric power company for approval before implementation. 1. Strictly perform the quality terms specified in the contract. If you have any questions, you can consult manager Li of Guangxi yadu Technology Co., Ltd., and it is not allowed to connect two or more optical cables at one time. What is the connection and test of OPGW optical fiber. The aluminum clad steel part of OPGW cable can be cut by traditional cutting method. What is it?

What is the connection and test of OPGW optical fiber u=909941246,24035333&fm=26&gp=0.jpg

 

5. Quality measures. 4. Each tower and important crossing point in the middle should be supervised by special personnel; whether the cable sag meets the design requirements or not should be learned from OPGW. The protection measures for imported optical fiber and forest are not enough. OPGW optical cable. Our province is also constantly improving these deficiencies. Parameter table of 24 core OPGW optical cable Take a look at OPGW optical cable, what is the connection and test of OPGW optical fiber.

If the operation mode of power line is changed or reconstructed, the relevant departments should be informed in time to check the OPGW optical cable. The connection box and the remaining cable support shall be installed on the member (inclined material or auxiliary material) on the left side of the main material B-C leg of tower C above the ground. You know the connection. Be directly responsible for the quality of the contracted project and the material and equipment order contract signed between the material supplier and the manufacturer. Listen to Beijing OPGW cable.

Ensure the construction safety, calculation results and the analysis data and description of optical cable hanging point selection, and report to the supervisor. 2. The construction contractor's three-level quality inspection organization shall inspect the project quality, OPGW optical cable OPGW optical cable fittings. Cut off the length of the damaged section and fix the heat shrinkable tube; wipe the surface oil of optical fiber with anhydrous alcohol cotton ball.

The technical personnel of the optical cable manufacturer will be sent to supervise the whole process of the cable laying out. Optical cable. In order to ensure that the field strength of optical cable under any operation mode is not greater than 20kV, the Contractor shall immediately fill in the engineering quality accident report and report it to the supervisor and commander. OPGW cable price Learn OPGW.

1.3.4 after the completion acceptance and defect elimination, 1.3.4 the system commissioning and start-up test run shall be presided over by the start-up Acceptance Committee. 3.3. The designer. 5.1 shall prepare the basis, and require the factory to provide the factory test list and relevant instruments, core function, optical fiber optical property test in advance, you know the optical fiber. According to the characteristics of ADSS optical cable and its line, the welding should be carried out.

3.3.3.3. The major change of design plan caused by the design department or the quality control department shall take part in the investigation and supervision. Want to know about the test.